Bright daycare playroom with large windows
Home  /  Services  /  Childcare Construction

Childcare Construction in Calgary

Safe, engaging spaces for children, with practical rooms for the staff who care for them.

PlayroomsBright rooms for each age group
Outdoor PlaySafe areas for active time
Staff SpacesStorage, kitchen, and office
Childcare Construction

A safe place to learn and play

Building a daycare involves creating a safe, engaging, and supportive environment for children. Top Touch Development ensures all constructions meet the highest standards of functionality and safety.

We think about the whole day: how families arrive, how children move between activities, and what staff need close at hand.

Get a quote for your daycare

Tell us about your project and our team will get back to you.

Daycare room with small tables and play areas Daycare classroom with colourful walls Daycare room with toy storage
Built To Work

Daycare Construction

Every decision starts with the children who will use the space.

  • Safety First: We incorporate secure access points, child-proofing, and emergency preparedness into our designs.
  • Engaging Spaces: We design lively areas conducive to learning and play, both indoors and outdoors.
  • Health and Safety Compliance: Our builds meet all stringent health and safety regulations.
  • Comfort and Convenience: We ensure facilities are comfortable and convenient for both children and staff, with ample storage, natural lighting, and ventilation.
Through The Day

Spaces for a full day of care

A daycare is a classroom, a playground, and a workplace all at once. Each area has its own job to do.

Playrooms

Open rooms with natural light, separated by age group.

Nap Areas

Quiet rooms or corners that staff can still supervise.

Change and Washrooms

Child-height fixtures and change stations close to the playrooms.

Kitchen

A kitchen or servery sized for daily snacks and meals.

Outdoor Play

Fenced, visible play areas with safe surfaces.

Entrance and Office

A secure entrance, stroller space, and an office for staff.

How It Works

From floor plan to first drop-off

Five stages, with children’s safety considered at every one.

01

Program Planning

We start with the number of children, their ages, and how your day runs.

02

Room Layout

Playrooms, washrooms, and outdoor areas are laid out with safety and supervision in mind.

03

Permits and Licensing

We secure the necessary permits and build with your licensing requirements in mind.

04

Construction

Secure access, durable finishes, and child-safe details go in as the work moves.

05

Final Inspection

We check every room with you so the centre is ready for families.

Plan Ahead

Plan these before you commit to a space

Space Per Child

Licensing rules set a minimum play space per child, which decides how many children each room can hold.

Outdoor Access

Not every commercial unit has room for a safe outdoor play area.

Zoning

A childcare centre may need a change of use, so check with the city before signing a lease.

Exits and Fire Safety

Buildings used for childcare have their own exit and fire safety requirements.

FAQ

Questions daycare operators ask us

Have a question about your space?

Call us and talk it through with the team.

403-470-3607
Can you include outdoor play areas?

Yes. We design lively areas conducive to learning and play, both indoors and outdoors.

Can a retail or office unit become a daycare?

It is often possible, depending on zoning, exits, and outdoor space. It is worth checking before you sign a lease.

What finishes work best in a daycare?

Durable, easy-to-clean floors and walls, rounded details where children play, and plenty of natural light.

Do you help with licensing?

Your licence comes from the province, so the final say is theirs. We build the space with those requirements in mind and provide the building details you need.

How long does a daycare build take?

It depends on the size of the centre, the condition of the building, and the approvals needed. We set project goals and create a detailed schedule before work starts.

Planning a daycare in Calgary?

Tell us about your project and our team will get back to you.

Get a Quote